Salem Town Hall

2 Comments

2 Responses to Salem Town Hall

  1. Pingback: pre workout supplements

  2. Pingback: maiunemn scaprtsi

Project Delivery System:

General Contract

Owner:

Town of Salem

Location:

Salem, Wisconsin

Construction Duration:

8 1/2 months

Building Square Footage:

12,940 sf.

Project Description:

The building addition is single-story; constructed of block with a brick veneer exterior, precast concrete plank floor system, a shingled wood truss roof system, wood-framed interior walls, and an elevator to the basement level.
The building addition included a lobby, large conference room, numerous storage rooms, break room, and restrooms on the first floor. The basement consisted of a storage room, a three-HR secure storage room, various mechanical rooms, and plumbing rough-ins for future toilet rooms.