First United Methodist Church

Leave a comment

Comments are closed.

Project Delivery System:

Negotiated General Contract

Owner:

First United Methodist Church

Location:

Kenosha, Wisconsin

Construction Duration:

8 months

Building Square Footage:

40,000 sf.

Project Description:

The demolition began with interior stairs, walls an stage area. The rebuild included new restrooms, offices, classrooms and a library. New stair and an elevator were added in this three floor elevation remodel. A catwalk was built from the front of the church to the back through an open meeting area below.