Project Delivery System: Negotiated General ContractOwner: First United Methodist ChurchLocation: Kenosha, WisconsinConstruction Duration: 8 monthsBuilding Square Footage: 40,000 sf.Project Description: The demolition began with interior stairs, walls an stage area. The rebuild included new restrooms, offices, classrooms and a library. New stair and an elevator were added in this three floor elevation remodel. A catwalk was built from the front of the church to the back through an open meeting area below. |