Corporate Headquarters

601 Blackhawk Drive, P.O. Box 740

Burlington, WI 53105

P: (262) 539-3100

F: (262) 539-3101

Wausau Office

815 S. 24th Avenue, Suite 100

Wausau, WI 54401

P: (715) 804-0830

F: (715) 804-0831

  • Facebook - White Circle
  • Twitter - White Circle
  • LinkedIn - White Circle

 © 2016 Scherrer Construction

PROJECT EXPERIENCE

Big Foot Union High School 

Walworth, WI 

Owner: 

Big Foot Union High School District

Size: 

10,165 SF 

Architect/Engineer:

Plunkett Raysich Architects

Details: 

The newly renovated 569 seat auditorium includes a stage, lighting, sound booth with state-of-the-art audio/visual system, and an engineered acoustical ceiling/wall treatment. Exterior improvements include a partial roof replacement, tuck pointing, exterior door replacements with aluminum frame and FRP systems, and reconstruction of the parking lot and tennis courts.