PROJECT EXPERIENCE

Big Foot Union High School 

Walworth, WI 

Owner: 

Big Foot Union High School District

Size: 

10,165 SF 

Architect/Engineer:

Plunkett Raysich Architects

Details: 

The newly renovated 569 seat auditorium includes a stage, lighting, sound booth with state-of-the-art audio/visual system, and an engineered acoustical ceiling/wall treatment. Exterior improvements include a partial roof replacement, tuck pointing, exterior door replacements with aluminum frame and FRP systems, and reconstruction of the parking lot and tennis courts. 

Corporate Headquarters

601 Blackhawk Drive, P.O. Box 740

Burlington, WI 53105

P: (262) 539-3100

F: (262) 539-3101

Wausau Office

151411 Robin Lane, Suite 100

Wausau, WI 54401

P: (715) 804-0830

F: (715) 804-0831

  • Facebook - White Circle
  • Twitter - White Circle
  • LinkedIn - White Circle

 © 2016 Scherrer Construction

Big Foot Union High School