EDUCATIONAL
K-12 SCHOOL CONSTRUCTION IN WISCONSIN
Scherrer Construction is a leading industry partner in school construction, having completed over $200M of school construction projects just within the last 5 years. We understand the unique needs and referendum challenges school districts face. Our dedicated pre-referendum team will help you confirm your needs, identify costs and develop an effective communications campaign to engage the community that will result in a successful referendum.

Karcher Middle School
145,000 SF
The new school now serving over 700 students features several core curriculum classrooms including special education and spaces for elective programming (STEAM, art, band, orchestra, and choir), a two-station gym, fitness room, and locker rooms, commons areas including a library with flexible learning spaces, cafeteria, staff offices, and additional work and storage rooms.
.jpg)
Williams Bay Elementary
Eppstein Uhen Architects
97,500 SF
This new two-story elementary school is an addition to the middle/high school. The new facility includes several classrooms, common areas, a full-sized gym with two basketball courts, a multi-purpose stage, weight room, and media center.

Garden Prairie Intermediate
86,000 SF
The new school features an elongated design with north and south wings separated by a central core that houses the cafeteria/common area, a 2-station gym with 400 seat bleacher system, library/media center and STEM area. Themed academic wings such as riverfront, farmland & wilderness are showcased throughout the building to enhance student learning and inspiration all equipped with their own locker areas, bathrooms, and breakout rooms. Larger halls were designed to offer ample and flexible learning space for small groups of students to work in.

Fox River Middle School
68,635 SF addition
The addition to the 1964 building includes a 2-story commons area, gym, 8th-grade wing, music wing, and art wing. Upgrades include an area for IT students, a new library/LMC, a fitness center, and kitchen instructional classrooms. The rest of the school was updated to architecturally match the interior of the addition both inside and out.

Waterford Union High School
121,800 SF
This was an expansion to the 1998 project completed by Scherrer Construction. The addition included technology education classrooms, commons/cafeteria, kitchen, multi-purpose rooms, locker rooms and a 500 seat auditorium with a stage and drama area.

Wilmot Union High School
284,000 SF
The new facility features 39 additional classrooms, tech ed areas, computer and science labs, administration offices, a 750-seat auditorium, and gymnasium. A new commons and cafeteria area seats 625. The new athletic field includes a synthetic turf combination football & soccer field, running track, long jump, pole vault pits & a 2,500-seat grandstand. Also included are baseball and softball diamonds, eight tennis courts & practice football & soccer fields.

DCE Evergreen Elementary
Nexus Solutions Somerville, Inc
22,000 SF
Phase 1 was a remodel of existing classrooms. Phase 2 consisted of the addition of two classrooms and a new multi-purpose room (gym/cafeteria), kitchen, and administrative offices. Phase 3 was a remodel of existing classrooms and library area.

Lakewood School
60,000 SF
This project includes a new gymnasium, school entrance and office addition, new classrooms, upgrades to the science lab, and renovations to the restrooms and offices.

Stanley Boyd Athletic Complex
80-acre Site
The new multi-use athletic facility features a synthetic turf system for the football/soccer field, 2,500 capacity grandstand, a running track, and a field. This three-phase project also included the construction of the plaza, press box, concessions, restroom, and parking areas. Site improvements include erosion control, site access/security, demolition, earthwork, landscaping, utilities, concrete flatwork, dense graded base, fencing/gates, masonry, entry portal, and restoration.

Wheatland Center School
Bray Architects
48,000 SF
This project consisted of multiple classroom addition and renovations to the library, early childhood, 4K, art and STEM classrooms, and science lab to create flexible, hands-on learning spaces. A dedicated middle school drop-off/pick-up lane and additional parking were also created to improve traffic patterns. Multiple mechanical improvements include remodeling bathrooms to make ADA compliant, replacement of HVAC equipment, and electrical systems, and updating technology infrastructure. Updates for a more secure entry to the school were also constructed.

Marathon Elementary School
Plunkett Raysich Architects
12,600 SF
This project consisted of a cafeteria-kitchen and classroom addition, as well as renovations to the Elementary-Academy school and High School. The addition provides more space for students and staff while eliminating the transporting of food from the High School to MAES. A new kitchen, cafeteria, and large group space were created to better serve students and provide additional areas for school and community gatherings.

Delavan Darien Athletic Complex
Point of Beginning Inc, Blue Design Group LLC
8,000 SF
The new athletic complex features a synthetic turf multi-use field, separate natural turf practice fields, a new running track, concessions building with restrooms, a ticket booth and entryway, team rooms, and storage rooms. Major improvements were also done to the original concrete bleacher system and tennis courts. The new complex will support not only the school district but also numerous clubs and organizations within the community.
RECENT PROJECT HIGHLIGHT VIDEO
Karcher Middle School

Karcher Middle School
HIGHER EDUCATION CONSTRUCTION IN WISCONSIN





BUILDING THE FUTURE OF EDUCATION
Scherrer Construction is a leading industry partner in K-12 and higher education construction, serving all of Wisconsin. We continue to grow and learn with our educational partners to ensure facility and maintenance needs accommodate and coincide with curriculum-supported design.
SUPPORTING 21st CENTURY LEARNING
We design and build schools that foster creativity and collaboration in learning. We support school districts as the cornerstone of community education, where everyone is a learner. Our team strategizes with community participants to ensure every component of the project is built to support the needs of students, staff, and community members. Our facility studies and designs are deliberate, thought out, and justified with a functional purpose that welcomes imminent opportunity of 21st Century Learning.
FACILITY STUDIES
We review each facility’s ability to accommodate change, expansion, tenant movements, redevelopment, and campus security. We design customized solutions that support fluid district operations and community engagement.
REFERENDUM SUPPORT
Scherrer Construction has a dedicated referendum support team that takes an active role in the pre-referendum process. Our team uses a customized strategy that relates and connects with the community. Our communication channels are transparent, detail oriented, and encourage the engagement of all constituents. Our goal is to celebrate the success of a passed referendum with your district.
CONTACT US
Madison, Milwaukee, Green Bay, Kenosha, Racine, Appleton, Waukesha, Eau Claire, Oshkosh, Janesville and the whole state of Wisconsin.
Scherrer Construction is a General Contractor Specializing In Municipal, Industrial and Commercial Construction in Wisconsin