HEALTHCARE
With over $500M in healthcare construction experience, we have the expertise to be your healthcare construction partner with experience ranging from dental clinics, to long-term care, to multi-level hospitals. Maintaining a safe and comfortable environment for your patients and staff is very important to us, so Scherrer will ensure that construction has a minimal impact.

Aurora Health Center
Carstenson Development
68,000 SF
Demolition included removal of load bearing masonry walls for construction of a new exterior column and window wall system. New construction included five pods, each consisting of a reception area, twelve exam rooms, nurses station, procedure room and physician offices.

Innovative Health & Fitness
Carstenson Development
Two level wellness center with exterior skin of pre-cast concrete, glass and architectural metal. Natatorium structure features laminated beams and wood deck. Interior components include three pools, cardiovascular exercise, running track, free-weights and children’s climbing gym.

Golden Years of Lake Geneva
33,407 SF
This new 30-bed skilled nursing home and rehab facility includes a kitchen and dining area, therapy gym, multiple living space and outdoor seating features. This project was Phase 1 of several phases in which will consist of independent living and a dementia care center.

FHC of Marshfield Dental Clinic
Family Health Center of Marshfield
12,000 SF
This new geo-thermal building will operate as a dental clinic practice that will see both adult and pediatric patients. The facility includes reception area, waiting areas, several offices, treatment and hygiene rooms, x-ray and surgery rooms.

Oak Creek Veterinary Clinic
5,500 SF
This brand new full-service vet clinic facility includes several exam rooms, a radiology room, dental and surgery rooms, a dog kennel, and pharmacy areas.

Marshfield Clinic Urgent Care
This was an interior remodel that took place in several different areas of the facility including the lobby, exam rooms, offices, common areas, x-ray laboratory and nurses stations. Scherrer Construction supported the extended scope and evolution of the project to completion.

Animal Emergency Center
11.740 SF
Poured Concrete foundations, partial basement, masonry walls with brick veneer. Shingled, pitched roof, aluminum window/door system. Building consisted of seven doctor’s offices, library, conference room, exercise and break room, radiology with dark room, four exam rooms, prep, procedure, lab, ICU surgery rooms, and admission and waiting room with vaulted ceilings. Fully-equipped to meet the needs of this state-of-the-art facility.

Pine Brook Pointe
40,440 SF
This project was a two-story, 60 unit, 66 bed CBRF elderly housing. It was constructed using framed construction, pitched shingled roofing, brick and siding exterior finish. There is a kitchen, living room, recreation room and dining room with fireplace in each of the six living pods. There is one fully furnished preparation kitchen and main great room with fireplace. The ice cream parlor is connected to an outside garden deck overlooking a fully landscaped courtyard garden with gazebo.

United Physicians Clinic
United Healthcare Systems Inc
5,217 SF
The clinic has a concrete foundation wall with slab on grade. It is a wood framed building with wood trusses and shingled roof. The exterior makeup is decorative block, cast stone and brick. The interior includes three doctor offices, nine exam rooms, an employee break room, records room, nurses station and waiting and reception areas.


.png)
Small Animal Hospital
6,100 SF
The Small Animal Clinic’s structure is a traditional stick frame with brick and stucco veneer. The facility boosts five exam rooms, pharmacy, labs and treatment areas, procedure room, surgery and x-ray rooms. The reception area has separated dog and cat waiting rooms with vaulted oak ceilings. The new clinic emerged from previously contaminated and abandoned grounds and is part of the Wisconsin Brownfield Redevelopment project.
Golden Years of Walworth
82,825 SF
This was a long term project that included 54 assisted living units, a 26 bed skilled care facility, and a 19 unit community based residential facility. Reinforced masonry foundation, wood frame construction with brick veneer and shingled roofing was use throughout renovations and additions.
Aurora Lakeland Medical Center
31,500 SF
Scherrer Construction has performed numerous renovations and additions to areas including the oncology department, x-ray rooms, emergency room, rehabilitation center, MRI rooms, as well as exterior improvements.
Recently, Scherrer completed a remodel of what was once a physical therapy department into a sleep center. This new area includes 4 sleep suites with bathrooms, set-up rooms, a nutrition room, and tech work room.
KEYS TO SUCCESS IN HEALTHCARE CONSTRUCTION
Scherrer Construction meets the unique needs and guidelines of healthcare construction by ensuring every component of the project is built to support treatment functions, care efficiencies, and to create a comfortable experience for all. We respect the standards of healthcare construction and the standards of care within your healthcare organization.
PATIENT AND WORKER SAFETY
Patient care and safety is our top concern on every healthcare project. From occupied renovations of small medical offices, to new construction of full-scope medical campuses, we follow rigorous standards in environmental infection control, dust and moisture control, interim life safety measures, vibration mitigation, shut-down and evacuation coordination, and HIPAA compliant privacy considerations. During occupied renovations, we work closely with healthcare personnel to ensure construction does not interfere or compromise the patient care setting. Our healthcare team is certified in Healthcare Construction and Infection Control by the Wisconsin Healthcare Engineering Association (WHEA).
ENVIRONMENTAL INFECTION CONTROL
Scherrer Construction maintains a safe, clean environment throughout construction. We continuously monitor water damage prevention, HEPA ventilation management, dust containment and removal, moisture control, barrier management, portable containment, air pressure control, and emergency planning.
NOISE CONTROL
Our project managers schedule heavily audible construction activity around core operating hours to decrease client and patient distraction and inconvenience.
PATIENT PRIVACY
Our team is required to review and sign off on the facility owner’s privacy practices prior to project commencement. We maintain the privacy and integrity of patients, visitors, and staff at all times.
SUSTAINABILITY
We strategize to guarantee project sustainability, long-term value, energy efficiency, and facility operations and productivity. Our LEED certified project managers focus on reducing waste, optimizing water and energy use, and improving indoor air quality. We work to achieve Energy Star® ratings and ongoing energy efficiency cost savings.
CONTACT US
Madison, Milwaukee, Green Bay, Kenosha, Racine, Appleton, Waukesha, Eau Claire, Oshkosh, Janesville and the whole state of Wisconsin.
Scherrer Construction is a General Contractor Specializing In Municipal, Industrial and Commercial Construction in Wisconsin